Expo Gate, Milan EXPO 2015

Expo Gate, Milan EXPO 2015

Project's Categories COMPETITIONS, EXHIBITION, RETAIL AND MALL
Services provided Competition entry, complete Structural Design from Preliminary to Good for Construction.
Client Triennale di Milano on behalf of EXPO 2015
Architect Alessandro Scandurra
Builder ICG + Stahlbau Pichler
Contruction year 2013 - 2014
Structure value 970.000 €

WINNING PROJECT - DESIGN COMPETITION

Following the path of a total identity between Architecture and Structure, we choose a structure based on a high density of extremely slender elements, which are combined to form a simple and clear resisting scheme, to be put together on site after extensive prefabrication in shop.

The structural mechanism is built up by the composition of a basic element: the portal scheme, hinged at the base, crossed orthogonally according to the principal axes of the volume.

The main element can be identified:

- transversal frames (portals)
- longitudinal frames (portals)
- roof level bracing elements

and the combination of such elements gives birth to a rational structural system which is solid, rigid, stable and extremely light. The glazed cladding is suspended at the interior of the structural esoskeleton.

Coherently with the choice of a diffused structure, the system is developed by the extensive utilization of truss schemes, which means by taking advance of axial load resistance of the members in a strut-and-tie relationships, avoiding any flexural behaviour.
The structural members are commercial circular hollow sections in S355 steel, shop-welded to form structure segments which are assembled on site by simple male-female joints. The whole structure is galvanized and painted.

Being the structure pushed to its limits in terms of member slenderness, extensive non-linear verifications have been carried on.

The rationality of the structural scheme is reflected by the erection method, that we designed as a sequence of self-stable stages, to be built without need of temporary propping or scaffolding.